mirror of
https://github.com/nodejs/node.git
synced 2026-11-21 12:59:16 -05:00
doc: add issue labels sections to release guide
PR-URL: https://github.com/nodejs/node/pull/35224 Reviewed-By: Beth Griggs <Bethany.Griggs@uk.ibm.com> Reviewed-By: Richard Lau <riclau@uk.ibm.com> Reviewed-By: Daijiro Wachi <daijiro.wachi@gmail.com> Reviewed-By: Anna Henningsen <anna@addaleax.net> Reviewed-By: Rich Trott <rtrott@gmail.com>
This commit is contained in:
1 parent
14e98825a1
commit
ed8af4e938
1 file changed
+23
@@ -747,6 +747,14 @@ For example:
|
||||
|
||||
The changes must be made as part of a new semver-minor release.
|
||||
|
||||
### Update release labels
|
||||
|
||||
The `lts-watch-vN.x` issue label must be created, with the same color as other
|
||||
existing labels for that release line, such as `vN.x`.
|
||||
|
||||
If the release is transitioning from Active LTS to Maintenance, the
|
||||
`backport-requested-vN.x` label must be deleted.
|
||||
|
||||
## Major Releases
|
||||
|
||||
The process for cutting a new Node.js major release has a number of differences
|
||||
@@ -783,6 +791,21 @@ One month or less before the release date, commits must be cherry-picked into
|
||||
the two branches. To land `SEMVER-MAJOR` at this time requires no objections
|
||||
from the TSC.
|
||||
|
||||
### Create release labels
|
||||
|
||||
The following issue labels must be created:
|
||||
|
||||
* `vN.x`
|
||||
* `backport-blocked-vN.x`
|
||||
* `backport-open-vN.x`
|
||||
* `backport-requested-vN.x`
|
||||
* `backported-to-vN.x`
|
||||
* `dont-land-on-vN.x`
|
||||
|
||||
The label description can be copied from existing labels of previous releases.
|
||||
The label color must be the same for all new labels, but different from the
|
||||
labels of previous releases.
|
||||
|
||||
### Release Proposal
|
||||
|
||||
A draft release proposal should be created two months before the release. A
|
||||
|
||||
Reference in new issue
Block a user